What dual-source actually costs

A metals buyer on the difference between a second name on the AVL and a second plant that can ship to drawing.

The Industrial Brief with Priya Shah, VP procurement, heavy equipment OEM · 9 September 2026 · 31 min

Typographic card reading 'What dual-source actually costs' in serif type on cream, with The Industrial Brief reticle mark
Graphic: The Industrial Brief
  1. 00:01The AVL fiction
  2. 09:20Qualification is the real dual-source
  3. 18:55Paying for idle capacity on purpose
  4. 26:10What to tell the board

Shah’s working definition: a dual source is not a second logo. It is a second plant that has shipped your drawing, at your spec, in the last twelve months. Everything else is a slide.

She puts a number on qualification — tooling, first-article, PPAP-equivalent, the slow audit of heat-treat and chemistry. The cost sits in the P&L as ‘resilience’ only if someone owns it. Otherwise it is a surprise in quarter four.

The useful board sentence: dual-source is an inventory decision about knowledge, not tonnes.